One of the largest jobs, the damp course and ground floor needed to be finished. With help from Dad and a friend of his, we were on a 5 day mission to sort it!
Part 1. we hired a DPC Injection machine and drilled a bunch of holes. We then injected a DPC around the inside of the front and back living room.
Part 2 The ‘orrible wall on the stairs was removed, as was every radiator, and the stairs were propped up using acrow props. Instantly looks much brighter and airy!
Part 3 – Dig out the rest of the rubble underneath the floor and relay new joists where the old ones used to be, and spray with Timber & Wood preserver to prevent dry rot, wet rot and any woodworms munching on the wood.
Part 4- Relay and hammer down the floorboards from the front of the room to the back!